On 2018-08-08 14:48:54
2018 Heat Treatment International Specialized Exhibition on Technologies and Equ
On 2018-08-08 11:45:46
Ready to start
Starting conditions: Cooling control and atmosphere control complete
Step 1: Start flushing
Nitrogen large-flow butterfly valve and nitrogen discharge valve are opened. The fan starts low-speed operation and the feedback signal is in place.
Step 2: Flush timing
When N2 purging flow ≥ set value and converter of furnace fan operates normally, PLC timer is started and the inner cover pre-flushing is completed after reaching the set time. If one of these conditions is not met, the timer clears "0".
Step 3: Flush is complete
The butterfly valve with large nitrogen flow is opened, the N2 discharge valve is closed, and the furnace fan stops.
Purge control link behind bell furnace inner hood