1. Check protective measures and wear labor protection appliances.
2. Regularly and comprehensively check whether the equipment, pipelines, instruments and electrical appliances are normal; whether the gas, electricity and water systems are unblocked; and check the air tightness of various parts such as seals and water seals. Air leakage, electric leakage, water leakage, poor electrical contact or instrument failure shall be repaired in time.
3. The gas producer should be operated by special personnel to determine the high degree of responsibility.
4. It is necessary to add coal frequently, add less coal and drill frequently to ensure that there is no coking inside the furnace.
5. Ensure the normal water level in the air bag, put an end to water free operation, and pay attention to the reading on the air bag pressure gauge, which must be controlled below 1 kg pressure.
6. The coal seam is controlled at about 1.4m (gas space distance). Put an end to excessive ash, coal seam is too low burning hood. Put an end to lazy ash, coal seam is too high, burn out bell jar and form gas outlet temperature is too high.
7. The ash pan should rotate 1 / 4 revolution per hour to keep the gas furnace well ventilated.
8. Strictly follow the ignition procedure of gas producer and heating furnace.
9. There should be no open fire and high temperature substances near the ammonia decomposition generating unit and purification unit.
10. Ammonia bottle cooling water tank, water level is not less than 1.2m
11. Ammonia decomposition pure gas flowmeter is less than 15m3 / h.
12. Ammonia decomposition ammonia pressure gauge ≤ 0.1MPa.
13. The pressure gauge for ammonia decomposition is ≤ 0.04MPa.
14. The ammonia decomposition regeneration flowmeter is less than 0.35m3/h.
15. The normal gas supply time of adsorption tower is 72 hours.
16. The ammonia and oxygen tubes should be replaced regularly on the ammonia decomposing machine.
17. When the ammonia decomposing machine group I and group II are used interchangeably, the gas must be driven for 50 minutes.
18. In case of failure of ammonia decomposition generating unit and gas purification unit, and normal gas supply cannot be guaranteed, the ammonia inlet valve, ammonia decomposition gas outlet valve and vent valve shall be closed immediately, and the safety nitrogen valve shall be opened immediately to exhaust the mixed gas of nitrogen and hydrogen in the inner cover and stop heating.
19. Stop ammonia decomposing machine, must operate in strict accordance with the regulations.
20. The power supply should be cut off when the heating furnace body and cooling cover are hoisted. Live operation is strictly prohibited. When lifting the inner tank and cooling cover, pay attention to turn on the cooling water switch.
21. Regularly check the water level in the anti riot box to keep it stable. It is strictly forbidden to cause air backflow accidents due to too low or no water.
22. Check whether the sealing rubber ring on the furnace seat is in good condition. When fastening the inner liner, the opposite bolts must be tightened to prevent flattening and air leakage.
23. Before vacuumizing, close the ammonia decomposition inlet valve of the furnace seat, turn off the waste gas valve of the furnace seat, and open the vacuum valve of the furnace.
24. The ignition color of the exhaust gas from the riot box is orange.
25. Furnace seat fan is not allowed to start directly at high speed. It should be low speed first and then high speed to ensure the service life of motor.
26. In the process of furnace burning, the operators of gas generator and heating furnace shall cooperate and operate synchronously, and operate in strict accordance with the operation process requirements.